4.
Opentherequiredconduitknockoutsaccordingtotheconduitsusedintheinstallation(refertothe
figurebelowforrequiredknockouts;someoftheknockoutsmayalreadybeopenbutsealed):The
knockoutsarelocatedatthebottomandsidesoftheenclosure,eachwithtwosizes:¾''and1''.Open
therequiredknockouts,takingcarenottointerferewithanyoftheinternalcomponents.AUnibit
drillmaybeused.
Figure 44: StorEdge Connection Unit knockouts
NOTE
Unused conduit openings and glands should be sealed with appropriate seals.
Appendix B: Opening Conduit Knockouts
SolarEdge-StorEdge Installation Guide MAN-01-00262-1.2
97