EasyManua.ls Logo

SPI Lasers redPOWER QUBE - Figure 8 QUBE Fiber Laser in Packing Case as Received; Figure 11 Bubble Wrap and Top Foam Block Removed

SPI Lasers redPOWER QUBE
132 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
© 2016 SPI Lasers UK Ltd.
Commercial in Confidence
SM-S00500 Revision A 21 October 2016
redPOWER QUBE Cased Fiber Laser User Manual
33
Figure 8 QUBE Fiber Laser in Packing Case as Received
1. Remove plastic banding and unclip the straps surrounding the packing case. Remove
the top tray.
2. Open up the flaps.
3. Free the optical connector from its location in the top foam block and remove the top
foam block. (Do not remove the foam from the optical connector.)
Figure 9 Bubble Wrap and Top Foam Block Removed
4. Remove the foam packing pieces from the top of the QUBE Fiber Laser. Attach a four
point sling assembly with shackles to the loops at the top of the steel transport frame.

Table of Contents