© 2016 SPI Lasers UK Ltd.
Commercial in Confidence
SM-S00500 Revision A 21 October 2016
redPOWER QUBE Cased Fiber Laser User Manual
Figure 26 Connector before removal of protective tape
Remove the protective tape, shown in Figure 26, from the connector.
Inspect the optical connector for contamination using suitable magnification and
illumination, and clean if necessary following the instructions in Section 13.3.
Figure 27 Red Dots Aligned
Install the optical connector into the receiver using the 2-step bayonet fitting on the front of
the connector. Ensure the red dot on the optical connector is aligned with the two red dots
on the receiver (refer to Figure 27)
Locking Step 1:
Fully insert the optical connector (Figure 28) and turn the locking sleeve through about a
tenth of a turn in a clockwise direction
Locking Step 2:
Pull the sleeve out by 2mm
Whilst in the pulled-out position rotate the locking sleeve until hand tight
Tighten by hand only