72 6390-009-002 REV D www.stryker.com
Service
Primary coil replacement, foot end (Continued)
6. Using the second 1/8'' hex wrench, insert the wrench into the anchor pivot pin to remove the other screw and
remove the release lever housing.
Note: The LED cable will still be attached. Do not pull the parts to prevent damage.
7. Using a 1/4'' hex wrench, remove the two screws (C) that secure the flat roller assembly and the V-guide roller
assembly on the foot end of the anchor assembly (Figure 41 on page 72). Save all parts.
Figure 41: Remove the flat roller assembly and V-guide roller assembly
8. Using a 1/8'' hex wrench, remove two of the four flat head cap screws (D) from one side of the anchor plunger
assembly, mid (Figure 40 on page 71). Save the screws.
9. Using the second 1/8'' hex wrench, insert the wrench into the anchor pivot pin to remove the other two of the four
flat head cap screws (D) (Figure 40 on page 71). Save the screws.
10. Unplug the power cables from the extension cable from the underside of the anchor.
11. Remove the anchor plunger assembly, mid (E) from the anchor (Figure 40 on page 71).
12. Remove the anchor pivot pin (G) that holds the anchor coil assembly (H) to the anchor housing (J) (Figure 42 on
page 73).
13. Unplug the coil wires from the inductive primary board (I) (Figure 42 on page 73). Discard the anchor coil assembly.
14. Reverse steps to reinstall. Torque the V-guide roller assembly and flat roller assembly to 235 to 317 in-lb. Torque
the anchor mounting posts to 60 ± 10 ft-lb.
15. Verify proper operation before returning the product to service.