www.stryker.com 6390-009-002 REV D 79
Power-LOAD assembly
1. Cut pieces to desired length to cover void at either end, as needed.
2. Drill .400/.450 diameter hole through Item F for assembly. Hole to be drilled at pre-machined counter-sunk locations
only.
3. Torque to 60 ± 10 ft-lb
4. Drill .600/.656 diameter hole through item F for assembly hole to be drilled at one of the pre-machined pocket
locations only.