EasyManua.ls Logo

Sunways AT 5000 - Page 35

Sunways AT 5000
142 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
35
Depending on the grid operator and
the feed point, a three-phase meter or a
single-phase meter must be used.
Some grid operators require the use of a
reverse-current-capable meter.
A basic distinction is made between two
different connection options of the solar
inverter to the public power grid:
· 3-phase AC grid
(e.g. Germany)
· 1-phase AC grid (e.g. Italy, Spain)
!
CAUTION
Observe the regional regulations for the
grid connection.
In Germany the grid connection must
always be 3-phase!
The solar inverter always only feeds via
AC terminal 2. If several solar inverters
are operated in parallel in a 3-phase grid,
AC terminal 2 of the unit must be distrib
-
uted uniformly among the grid phases
L1, L2 and L3 to avoid unequal loading.

Table of Contents

Related product manuals