EasyManua.ls Logo

Suzuki Engine 2002 GRAND VITARA SQ625 - Page 303

Suzuki Engine 2002 GRAND VITARA SQ625
834 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6A1-12 ENGINE MECHANICAL (G16 ENGINE)
REMOVAL
1) Relieve fuel pressure according to fuel pressure relief proce-
dure described in Fuel Pressure Relief Procedure Section
6.
2) Disconnect negative cable at battery.
3) Drain cooling system.
4) Remove air intake hose.
5) Disconnect the following electric lead wires :
EGR valve
Ground wires from intake manifold
Manifold absolute pressure (MAP) sensor
Engine coolant temperature (ECT) sensor
Injectors lead wires at the coupler
EVAP canister purge valve
Throttle position sensor
Idle air control valve
6) Disconnect accelerator cable and A/T throttle cable (for A/T)
from throttle body.
7) Disconnect the following hoses :
Brake booster hose from intake manifold
Canister purge hose from EVAP canister purge valve
Engine cooling water (coolant) hose (outlet side) from throt-
tle body
Radiator inlet hose from thermostat cap
PCV hoses from intake manifold and throttle body
Fuel feed hose and return hose from each pipe
Vacuum hose from intake manifold
8) Remove generator adjust arm.
9) Remove intake manifold stiffeners from intake manifold.
WARNING:
To help avoid danger of being burned, do not remove
drain plug and radiator cap while engine and radiator are
still hot. Scalding fluid and steam can be blown out under
pressure if plug and cap are taken off too soon.

Table of Contents

Related product manuals