ENGINE COOLING 6B-31
3) Install timing chain cover. Refer to Section 6A2.
4) Install oil pan, front differential housing, P/S system, cooling
system, intake manifold with throttle body and other parts.
5) Refill cooling system with coolant, front differential with gear
oil, P/S system with specified fluid and engine with engine
oil.
6) Check wheel alignment. Refer to “Preliminary Checks Prior
to Adjusting Front Alignment” in Section 3A.
7) Verify that there is no fuel leakage, water leakage and oil
leakage at each connection.
8) Connect negative (–) cable at battery.
Engine Coolant Temperature (ECT) Sensor
Refer to “Engine Coolant Temperature (ECT Sensor)” in Section
6E1 (for G16 and J20 engine) or 6E2 (for H25 engine).
Required Service Materials
Tightening Torque Specifications
Material
Recommended SUZUKI product
(Part Number)
Use
Ethylene glycol base coolant
(Anti-freeze/Anti-corrosion
coolant)
– Additive to engine cooling system for
improving cooling efficiency and for
protection against rusting.
Sealant SUZUKI BOND NO. 1215
(99000-31110)
Water outlet pipe bolt
Fastening part
Tightening torque
N•m kg-m lb-ft
Cooling fan pulley adjusting and pivot bolts (J20 engine) 45 4.5 32.5
Water pump bolts (G16 engine) 12 1.2 8.5
Water pump bolts (J20 and H25 engines) 27 2.7 19.5
Crankshaft pulley No.2 bolts (G16 engine) 16 1.6 11.5