CHARGING SYSTEM 6H-17
4) Disconnect “B” terminal wire and coupler from generator.
5) Remove generator belt. Refer to Section 6B “Engine Cool-
ing” (G16 and H25 engines) or “Generator Belt” (J20 engine)
in this section.
6) Remove generator.
Remounting
1) Mount generator on the generator bracket.
2) Tighten generator bolts.
Tightening torque
Generator mounting bolt (a) : 23 N·m (2.3 kg-m, 17.0 lb-ft)
Generator mounting bolt (c) : 48 N·m (4.8 kg-m, 35.0 lb-ft)
3) Install generator (cooling fan) belt. Refer to Section 6B
“Engine Cooling” (G16 and H25 engines) or “Generator Belt”
(J20 engine) in this section.
4) Install cooling fan belt (J20 engine only). Refer to Section 6B
“Engine Cooling”.
5) Connect “B” terminal wire and coupler to generator.
Tightening torque
(b) : 6.9 N·m (0.69 kg-m, 5.0 lb-ft)
6) Install canister.
7) Install air cleaner outlet hose.
8) Connect negative (–) cable at battery.
1. Generator
2. Coupler
3. “B” terminal
1. Upper generator bolt (Short)
2. Lower generator bolt (Long)
3. “B” terminal
1. Upper generator bolt (Short)
2. Lower generator bolt (Long)
3. “B” terminal