getting started
19
Synrad Firestar f-Series operator’s manual
Inventory
Table 1-2 f200/f400 ship kit contents
Shipping Box Contents Qty Shipping Box Contents Qty
DC Power Cable (2 ea.) ...............................2 Spare 20 Ampere Fuses ............................... 2/4
Quick Start Plug (2 ea.) ...............................2 Chiller Fittings ............................................... 2
BNC “Y” Control Cable (not shown) ......... 1 Hex Wrench (f400 only) ............................... 1
Cooling Tubing ............................................... 1 Spherical Washer Sets (f400 only) ........... 3
“Y Tubing Connectors ................................2 Cooling Kit ....................................................... 2
Mounting Bolts ..............................................3 Final Test Report (not shown) .................. 1
SYNRAD CO
2
Lasers Manual CD................1
f200/f400 contents description
Each item listed in Table 1-2 is described below:
DC Power Cable (2 ea.) – carries DC power from the DC power supply to your Firestar laser.
Quick Start Plug (2 ea.) – connects to Firestars User I/O connector for initial start-up and testing.
BNC “Y” Control Cable (not shown) – “Y”-type coaxial cable carries the PWM Command signal from the
UC-2000 Controller to both Set 1 and Set 2 Quick Start Plugs.
Cooling Tubing – carries cooling water from the chiller to the laser and back. This polyethylene tubing is
1/2-inch O.D. by 30 feet and must be cut to length. Two rolls of tubing are included with f400 lasers.
“Y Tubing Connectors – connects both sets of 1/2-inch WATER IN/WATER OUT connections on the
laser to the 1/2-inch tubing running to/from the chiller’s Inlet/Outlet ports.
Mounting Bolts – fasten Firestar to your mounting surface. Three 1/4–20 × 3/4" UNC capscrews are
provided for mounting f200 lasers. f400 ship kits include three each metric (M10 × 1.5 × 30 mm) and
standard (3/8–16 × 1.25") capscrews. M10 capscrews are initially used to fasten lifting handles to the f400’s
mounting feet.
SYNRAD CO
2
Lasers Manual CD – contains an f-Series manual that provides setup, operation, and main-
tenance information for your Firestar f-Series single-tube (f100/f201) or dual-tube (f200/f400) laser.
Spare 20 Ampere Fuses – fast-blow fuses protects Firestars internal circuitry.
Chiller Fittings – adapt 1/2-inch O.D. tubing to 3/8" NPT threads for connection to a chiller. The chillers
inlet and outlet ports must be equipped with, or be adapted to, 3/8" NPT female threads.
Hex Wrench (f400 only) – use to remove the M10 bolts fastening lifting handles to the mounting feet.
Spherical Washer Sets (not shown) – used in conjunction with Firestar f400 mounting bolts to align the
laser to your mounting surface. Shipped with f400 lasers only.
Cooling Kit – adapts the lasers straight 1/2-inch coolant ttings to 90° adaptor ttings for either 1/2-inch
standard or 12-mm metric cooling tubing.
Final Test Report (not shown) – contains data collected during the lasers nal pre-shipment test.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Synrad Firestar f series and is the answer not in the manual?

Synrad Firestar f series Specifications

General IconGeneral
BrandSynrad
ModelFirestar f series
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals