EasyManuals Logo

Takeuchi TB 250 User Manual

Takeuchi TB 250
352 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #166 background imageLoading...
Page #166 background image
4-61
4
HYDRAULIC PUMP
DISASSEMBLY AND ASSEMBLY
Assembly
1. Assemble the swash plate section.
a. Install the swash plate on the housing.
b. Install the bearing (11).
c. Install the distance piece (10).
d. Install the O-ring on the plate (9).
e. Install the plate (9) and secure it with cap screws.
Cap screw: 12 to 15 N·m
2. Assemble the shaft section.
a. Install the bearing on the shaft using the jig B.
Use the bearing as a bed and press fit the shaft
using a press or a plastic hammer.
b. Install the snap ring and secure the bearing.
3. Install the shaft on the housing.
Lightly tap the spring tip with a plastic hammer and
make sure that the outer ring of the bearing is se-
cur
ely fitted in the housing hole.
4. Install the O-ring.







Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Takeuchi TB 250 and is the answer not in the manual?

Takeuchi TB 250 Specifications

General IconGeneral
BrandTakeuchi
ModelTB 250
CategoryCompact Excavator
LanguageEnglish

Related product manuals