EasyManua.ls Logo

Takeuchi TB 250 - Page 197

Takeuchi TB 250
352 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4-92
4
PILOT VALVE
DISASSEMBLY AND ASSEMBLY
Inspection and adjustment
Checking the parts
Part Criteria Action
O-ring
Replace
Seal
Replace
Spool
Wear on the sliding portions is 10 μm or greater com-
pared to the non-sliding portions.
Scratches on the sliding portions
Spool does not move smoothly
Replace
Replace
Replace
Push rod Front end is worn 1 mm or more
Scratches on the sliding portions
Replace
Replace
Plug
Seal is imperfect due to damage Repair or replace
Controls Tightening is loose at the pin, shaft or joint of the con-
tr
ols, with looseness of 2 mm or greater
Due to wear, etc., tightening is loose at the pin, shaft or
joint of the controls, with looseness of 2 mm or greater
Tighten to the specified torque
Replace
Casing, port plate
Scratches, rust, or corrosion at the sliding parts with the
spool
Scratches, rust, or corrosion of the seal part in contact
with the O-ring
Replace
Repair or replace

Table of Contents

Related product manuals