EasyManuals Logo

Telwin PCP 18 LCD User Manual

Telwin PCP 18 LCD
124 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #7 background imageLoading...
Page #7 background image
- 7 -
4.3.2“START”button
Thispush-buttonmustbepressedtocontrolweldingineachofthefollowingconditions:
- everytimethemainswitchhastripped(pos.“O”=>pos.“I”);
- eachtimethesafety/protectiondevicescutin;
- whenthepowersupplyisreinstated(electricityandcompressedair)followinga
shutdownofpowersuppliesoramalfunction.
ATTENTION! PERIODICALLY MAKE SURE THE SAFE START
FUNCTIONOPERATESCORRECTLY.
4.3.3NOWELDING/WELDINGcycleswitch
-
NOWELDING:allowsuseofthespotweldingmachinewithoutwelding.Itis
usedtomovethearmsandclosetheelectrodeswithoutcurrentsupplies.
RESIDUALRISK!Thisoperatingmodealsocausestheresidualrisk
ofcrushingoftheupperlimbs:takeallnecessaryprecautions(see
safety chapter).
-
WELDING(normalweldingcycle):allowsthespotweldingmachinetoperform
welding operations.
4.3.4 Thermal protection switch (AL1)
Thisistriggeredbyoverheatingofthespotweldingmachineduetolowcapacityor
totallackofcoolingwater,orbyaworkcycle(DUTYCYCLE)thatexceedstheallowed
thermal threshold.
ThetriggeredswitchissignalledbytheiconinFIG.D2-9andtheAL1iconswitching
on.
EFFECT:currentblock(weldinginhibited).
RESET:manual(usingthe“START”button)afterthemachinetemperaturefallswithin
the allowed threshold (the AL1 icon will switch off and the “START” icon will switch on).
4.3.5 Compressed air safety switch (AL6 - PCP mod. only)
Thisistriggeredbylackoforlowpressure(p<2.5÷3bar)ofthecompressedair
supply;thetriggeredswitchisindicatedonthepressuregauge(0÷3bar)andtheAL6
icononthedisplay.
EFFECT:allmovementisblocked,theelectrodesopen(exhaustercylinder);poweris
shutdown(weldinginhibited).
RESET:manual(usingthe“START”button)afterthemachinepressurefallswithinthe
allowedthreshold(“START”indicationonthedisplay).
4.3.6 Overvoltage and undervoltage trip switch (AL3 and AL4).
This is triggered by an excessive overvoltage or undervoltage of the electricity
supply;thetriggeredswitchisindicatedonthedisplaybyAL3(overvoltage)andAL4
(undervoltage).
EFFECT:allmovementisblocked,exhaustercylinder(ifinstalled);powerisshutdown
(welding inhibited).
RESET:manual(usingthe“START”button)afterthemachinepressurefallswithinthe
allowedvoltagelimits(“START”indicationonthedisplay).
5. INSTALLATION
WARNING! CARRY OUT ALL INSTALLATION OPERATIONS AND
ELECTRICAL AND PNEUMATIC CONNECTIONS WITH THE SPOT-WELDER
COMPLETELY SWITCHED OFF AND DISCONNECTED FROM THE POWER
SUPPLYOUTLET. THEELECTRICALAND PNEUMATIC CONNECTIONS MUST
BEMADEONLYANDEXCLUSIVELYBYAUTHORISED,SKILLEDPERSONNEL.
5.1PRELIMINARYOPERATIONS
Unpackthespot-welder,assembletheseparatepartsasindicatedbelow.
5.2LIFTINGTHESPOT-WELDER (FIG. E)
Thespot-weldershouldbeliftedwithadoublecableandhooks,usingtheeyebolts
ttedforthispurpose.
Itisabsolutelyprohibitedtoslingthespot-welderinadifferentwayfromtheonewe
prescribed (e.g. on arms or electrodes).
5.3 POSITION
The installation area must be sufciently large and without obstacles, suitable for
ensuringsafeaccesstothecontrolpanelandtotheworkarea(electrodes).
Ensurethattherearenoobstaclesnearthecoolingairinletsandoutletsandthatno
conductivedusts,corrosivevapour,humidity,etc.canbesuckedin.
Position the spot-welder ona plane surface made of homogeneous and compact
material(oormadeofconcreteorsimilarphysicalcharacteristics).
Fasten the spot-welder to theoor bymeans offour M10bolts, usingthe special
holesonthebase;eachindividualelementanchoringthespot-weldertotheoormust
guaranteeatensilestrengthofatleast60Kg.(60daN).
Maximum load
The maximum load that can be applied to the lower arm (concentrated on the
electrode axis) is 35 Kg. (35daN).
5.4CONNECTIONTOTHEMAINPOWERSUPPLY
5.4.1Warnings
- Beforemakinganyelectricalconnection,checktheratingplatedataonthespot
weldertomakesuretheycorrespondtothevoltageandfrequencyoftheavailable
powersupplywherethemachineistobeinstalled.
- Thespotweldermustbeconnectedonlyandexclusivelytoapowersupplywiththe
neutralconductorconnectedtoearth.
- To guarantee protection against any direct contact always use the differential
switches indicated below:
-TypeA(
)forsingle-phasemachines;
-TypeB(
)forthree-phasemachines;
- Inorder tosatisfytherequirementsoftheEN61000-3-11 (Flicker)standardwe
recommend connecting the spot welder to interface points of the main power
supplythathaveanimpedanceoflessthanZmax=0.066ohm.
- ThespotwelderdoesnotfallwithintherequisitesofIEC/EN61000-3-12standard.
Shoulditbeconnectedtoapublicmainssystem,itistheinstaller’sresponsibility
to verify that the spot welding machine itself is suitable for connecting to it (if
necessary,consultthedistributionnetworkcompany).
5.4.2 Connecting the power supply cable to the spot-welder (FIG. F)
Removetherightsidepanel,assemblethesuppliedcableclipattheholedrilledon
thebackpanel.
Passthepowersupplycablethroughthecableclipandconnectittothepowersupply
block(phasesL1(N)L2)andtothescrewterminaloftheyellow-greenearthprotection
conductor.
Dependingontheterminalblockmodel,tthecableterminalsasshowninthediagram
(FIG. F1, F2).
Blockthecablebytighteningthescrewsonthecableguide.
See the “TECHNICAL DATA” paragraph for the minimum allowed section of the
conductors.
5.4.3 Plug and socket
Connectanormalizedplugtothepowercable(3P+T:only2polesareusedforthe
400V INTERPHASE SYSTEM connection; 2P+T: 230V INTERPHASE connection)
of appropriate capacity and prepare a power supply outlet tted with fuses or an
automaticcircuit-breaker;thecorresponding earth terminalshould beconnectedto
the(yellow-green)earthconductorofthepowersupply.
Thecapacityandinterventioncharacteristicsofthefusesandcircuit-breakerswitch
are given in the paragraph “OTHER TECHNICAL DATA” and/or in TAB. 1.
Shouldtwoormorespotweldersbeinstalled,distributethepowersupplycyclically
betweenthethreephasesinordertocreateamorebalancedload;forexample:
spotwelder1:powersupplyL1-L2;
spotwelder2:powersupplyL2-L3;
spotwelder3:powersupplyL3-L1.
WARNING!Failuretoobservetherulesgivenabovewillinvalidatethe
(class I) safety system provided by the manufacturer causing serious risks to
people(e.g.electricshock)andobjects(e.g.re).
5.5 PNEUMATIC CONNECTION (FIG. G) (PCP mod. only)
- Prepareacompressedairsupplylinewithaworkingpressureofatleast6bar.
- Connectthegaspipetting,suppliedasanaccessory,tothe1/8gascouplingin
FIG.G-1;useteontapetoguaranteeairtightsealing.
- Connectacompressedairhoseofanadequatesizeforthettingused);usea
suitablecliporcollartoguaranteeairtightsealing.
5.6 CONNECTING THE COOLING CIRCUIT (FIG. H)
Itisnecessarytosetupawaterdeliverypipeformaximumtemperature30°C,with
minimumowratenotlessthanthatspeciedinTECHNICALDATA.Itispossibleto
setupanopencoolingcircuit(discardingthereturnwater)oraclosedcircuitaslong
asthetemperatureandwaterowrateparametersarerespected.
Connectthewaterttingssuppliedasaccessoriestothe1/8gascouplingsinFIG.H:
thewatercouplingsarettedwith“OR”sealingringsanddonotrequiretheapplication
ofteontape.
Connectthewaterdeliverypipe(FIG.H-1)totheexternalwaterchannelling,checking
forcorrectoutowandthecapacityofthereturnpipe(FIG.H-2);useasuitableclipor
collartoguaranteeairtightsealing.
WARNING!Weldingoperationsperformedwithoutorwithinsufcientwater
owcouldcausethespot-weldertobreakdownduetooverheating.
6.SPOTWELDING
6.1PRELIMINARYOPERATIONS
Beforecarryingoutanyspot-welding operationit isnecessary tomake aseries of
checksandadjustments,whichshouldbecarriedoutwiththegeneralswitchinthe“O”
position(withthepadlockclosedinPCPversions)andwiththecompressedairsupply
switched off (DISCONNECTED).
- Ensurethattheelectricconnectionisdoneaccordingtothepreviousinstructions.
- Putthecoolingwaterintocirculation.
- Adjustdiameter”d”oftheelectrodecontactsurfaceaccordingtothethickness”s”
ofthesheettobespotwelded,accordingtorelationshipd=4÷6·√s.
- Betweentheelectrodesslideashimequivalenttothethicknessofthesheettobe
spotwelded;ensurethatthearms,broughttogethermanually,areparallelandthat
the electrode holders are centred.
Ifnecessary,makesomeadjustmentsbylooseningtheelectrodeholderlocking
screwsuntilyoundthemostsuitablepositionforthejobtobeperformed;secure
thelockingscrewstightly.
InmodelsPTEandPCP28,thegapbetweenthearmscanalsoberegulatedby
adjustingthefasteningscrewsofthelowerarmholdercasting(seetechnicaldata).
- Openthesafetygatelocatedontherearofthespot-welderbylooseningthefour
fasteningscrewstogetattheelectrodeforceadjustmentnut(wrenchNo.30).
Compressingthespring(screwthenutclockwise)willcausetheelectrodestoexert
graduallyincreasingforce withvaluesbetweenthe minimum andthemaximum
(see technical data).
Suchforcewillincreaseinproportiontotheincreaseinthethicknessofthesheets
to be welded and to the diameter of the electrode tip.
- Also regulate the ow reducer in FIG. D3-2 to decelerate the descent of the
electrodes;
Itisrecommendedtocompensatethedecelerationofthearmclosurewithalonger
approachtimetoallowtheforcetoreachthemaximumlevelbeforethemachine
starts welding.
Indicatively, withan inletpressure of8 barand theregulator screwunscrewed
halfway,set100approachcycles(2s);withtheregulatorscrewfullyopen(screw
completelyturnedinacounterclockwisedirectionandtheairownotchoked)set
20cycles(400ms).
- Closethegatetopreventextraneousmatterfromenteringandtopreventaccidental
contact with live or moving parts.
- CheckthecompressedairconnectioninPCPmodels,connectthefeedpipetothe
pneumaticsystem,adjustthepressurebyturningthereducerknobuntilthegauge
reads6bar(90PSI).
6.2 ADJUSTING THE PARAMETERS
The parameters determining the diameter (section) and the mechanical resistance of
spot welding are:
- forceexertedbytheelectrodes(daN);1daN=1.02Kg.
- diameteroftheelectrodecontactsurface(mm);
- weldingcurrent(kA);
- weldingtime(cycles):at50Hz1cycle=0.02sec.
Insummary,alltheabovefactorsmustbetakenintoconsiderationinadjustingthe
spot-weldergiventhattheyinteractbetweeneachotherwithrelativelyamplemargins.
Furthermore, other factors that could modify the results should not be neglected.
These are:
- excessivevoltagedropsonthepowerline;
- spot-welderoverheatingduetoinsufcientcoolingornon-observanceoftheduty

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Telwin PCP 18 LCD and is the answer not in the manual?

Telwin PCP 18 LCD Specifications

General IconGeneral
BrandTelwin
ModelPCP 18 LCD
CategoryWelding System
LanguageEnglish

Related product manuals