Page 2-6 Document Ref 942583-001 Rev 8
Site Preparation Quantium 510 Installation Manual
Model 2-2
Prod
2
40
Prod
1
40
Prod 1 Prod 2
B side (left)
In case of NON-preset with TQP-RS, the valves are not needed.
The valve is needed for Preset or in any case of submerge.
Example shown is B sided (left), A sided (right) is also available.
Blind side
A side (right)
Prod
2
40
Prod
1
40
40
Prod
2
40
Prod
1
Prod 1 Prod 2
Prod 2Prod 1
B side (left)
A side (right)
Model 2-4
Prod
2
40
Prod
3
40
Prod
1
40
Prod 1 Prod 2 Prod 3
B side (left)
A side (right)
In case of NON-preset with TQP-RS, the valves are not needed.
The valve is needed for Preset or in any case of submerge.
Example shown is B sided (left), A sided (right) is also available.
Blind side
Model 3-3