EasyManua.ls Logo

Tokheim Quantium 510 - Master & Satellite Models

Tokheim Quantium 510
143 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 2-16 Document Ref 942583-001 Rev 8
Site Preparation Quantium 510 Installation Manual
Model SVHS 5-8 L
Prod
1
40
Prod
2
40
Prod
3
40
Diesel
2
130
40
Diesel
1
Diesel 2Prod 3Prod 1 Prod 2
Diesel 1
B side (left)
A side (right)
40
Prod
3
40
Prod
2
40
Prod
1
1 x TQP-HS and 4 x TQP-RS or 5 x submerge.
In case of NON-preset with TQP-RS or TQP-HS, the valves for the last column are not needed.
The valve is needed for Preset or in any case of submerge.
Prod 1 Prod 2 Prod 3
2.2.4 MASTER & SATELLITE MODELS
Model HSM 1-1
Model SVHS 5-8 R
Prod
1
40
Prod
2
40
Prod
3
40
Diesel
2
40
130
Diesel
1
Diesel 2Prod 3Prod 1 Prod 2
Diesel 1
B side (left)
A side (right)
40
Prod
3
40
Prod
2
40
Prod
1
1 x TQP-HS and 4 x TQP-RS or 5 x submerge.
In case of NON-preset with TQP-RS or TQP-HS, the valves for the last column are not needed.
The valve is needed for Preset or in any case of submerge.
Prod 1 Prod 2 Prod 3
Diesel
1
80
Diesel 1
B side (left)
A side (right)
Blind side
In case of NON-preset with TQP-RS, the valves are not needed.
The valve is needed for Preset or in any case of submerge.
Example shown is B sided (left), A sided (right) is also available.
1kW
Satellite Feed with continuous
filling button (optional)

Table of Contents