EasyManua.ls Logo

Tokheim Quantium 510 - Page 33

Tokheim Quantium 510
143 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Document Ref 942583-001 Rev 8 Page 2-15
Quantium 510 Installation Manual Site Preparation
Model SVHS 3-4
Model SVHS 4-6
4040130130
Prod 3Prod 3
Prod
3
Prod
3
Prod
1
Prod
1
Prod 1Prod 1
B side (left)B side (left)
A side (right)A side (right)
130130
ProdProd
22
4040
ProdProd
11
2 x TQP-HS and 1 x TQP-RS or 3 x submerge.2 x TQP-HS and 1 x TQP-RS or 3 x submerge.
In case of NON-preset with TQP-RS or TQP-HS, the valves for the last column are not needed.In case of NON-preset with TQP-RS or TQP-HS, the valves for the last column are not needed.
The valve is needed for Preset or in any case of submerge.
Prod 1Prod 1 Prod 2Prod 2
4040130 40130
Prod 4
Prod
2
Prod
4
Prod
1
Prod
1
Prod 1 Prod 2Prod 1
B side (left)B side (left)
A side (right)A side (right)
130 40130
ProdProd ProdProd
23
4040
ProdProd
11
2 x TQP-HS and 2 x TQP-RS or 4 x submerge.
In case of NON-preset with TQP-RS or TQP-HS, the valves for the last column are not needed.
The valve is needed for Preset or in any case of submerge.The valve is needed for Preset or in any case of submerge.
Prod 1 Prod 2Prod 1 Prod 3

Table of Contents