RTHD-SVX01L-EN
85
Log and Check Sheets
The operator log and check sheet are included for use as
appropriate, for installation completion verification before
Trane start-up is scheduled, and for reference during the
Trane start-up.
Where the log or check sheet also exists outside of this
publication as standalone literature, the literature order
number is also listed.
• Optimus™ RTHD Installation Completion Check Sheet
and Request for Trane Service (RLC-ADF005*-EN)
• Chiller Settings
• Operator Log