86
RTHD-SVX01L-EN
Optimus™ Chiller Installation Completion Check Sheet
and Request for Trane Service
Important: A copy of this completed form must be
submitted to the Trane service agency that will
be responsible for the startup of the chiller.
Start-up will NOT proceed unless applicable
items listed in this form have been
satisfactorily completed. See unit IOM RTHD-
SVX01*-EN for detailed installation
instructions.
To:
___________________________
Trane Service Office:
___________________________
S.O. Number:
___________________________
Serial Numbers:
___________________________
Job/Project Name: ___________________________
Address:
___________________________
The following items are being
installed and will be
completed by: ___________________________
Important: Start-up must be performed by Trane or an
agent of Trane specifically authorized to
perform start-up of Trane® products.
Contractor shall provide Trane (or an agent of
Trane specifically authorized to perform start-
up) with notice of the scheduled start-up at
least two weeks prior to the scheduled start-
up.
Important: It is required that heaters are energized for a
minimum of 24 hours prior to start up.
Therefore, chiller should have power for this
amount of time before Trane Service arrives to
do start-up.
Check the box if the task is complete or if the answer is
“yes”.
1. Screw Chiller
☐ Installation meets foundation requirements
☐ In place and piped
☐ Isolation pads installed
2. Piping
☐ Chilled water piping connected to:
☐ Evaporator
☐ Air handling units
☐ Pumps
☐ Flow switch or flow proving device installed (if
not factory provided)
☐ Strainer installed and cleaned
☐ Condenser and heat recovery condenser (as
applicable) piping connected to:
☐ Condenser
☐ Pumps
☐ Flow switch or flow proving device installed (if
not factory provided)
☐ Cooling tower
☐ Heating loop (as applicable)
☐ Make-up water connected to cooling tower
☐ Water supply connected to filling system
☐ Does unit have freeze inhibitor? If unit has freeze
inhibitor:
☐ Verify type and concentration correct per unit
submittal
☐ Calculate and record freeze point of the
solution:_______________________
☐ Systems filled
☐ Pumps run, air bled from system
☐ Strainer installed in entering water piping
(evaporator and condenser) and cleaned
☐ Relief valve ventilation piping installed (if
applicable)
3. Flow balancing valves installed
☐ Leaving chilled water
☐ Leaving condenser water
☐ Proper porting to measure flow and balance
☐ Optional heat recovery or auxiliary condenser water
(if applicable)
4. Gauges, thermometers, and air vents
☐ Installed on both sides of evaporator
☐ Installed on both sides of condenser and heat
recovery condenser (as applicable)
5. Wiring
☐ Wire size per submittal and NEC 310-16
☐ Full power available
☐ External interlocks (flow switch, pumps auxiliary,
etc.)
☐ Chilled water pump (connected and tested)
☐ Condenser water pump (connected and tested)
☐ Cooling tower fan rotation checked
☐ Heat recovery condenser water pump (as
applicable)
☐ 115 Vac power available for service tools as
required