EasyManua.ls Logo

Trane Optimus RTHD - Chiller Installation Completion Check Sheet; Flow Balancing, Gauges, and Wiring Checks

Trane Optimus RTHD
92 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
86
RTHD-SVX01L-EN
Optimus™ Chiller Installation Completion Check Sheet
and Request for Trane Service
Important: A copy of this completed form must be
submitted to the Trane service agency that will
be responsible for the startup of the chiller.
Start-up will NOT proceed unless applicable
items listed in this form have been
satisfactorily completed. See unit IOM RTHD-
SVX01*-EN for detailed installation
instructions.
To:
___________________________
Trane Service Office:
___________________________
S.O. Number:
___________________________
Serial Numbers:
___________________________
Job/Project Name: ___________________________
Address:
___________________________
The following items are being
installed and will be
completed by: ___________________________
Important: Start-up must be performed by Trane or an
agent of Trane specifically authorized to
perform start-up of Trane® products.
Contractor shall provide Trane (or an agent of
Trane specifically authorized to perform start-
up) with notice of the scheduled start-up at
least two weeks prior to the scheduled start-
up.
Important: It is required that heaters are energized for a
minimum of 24 hours prior to start up.
Therefore, chiller should have power for this
amount of time before Trane Service arrives to
do start-up.
Check the box if the task is complete or if the answer is
“yes”.
1. Screw Chiller
Installation meets foundation requirements
In place and piped
Isolation pads installed
2. Piping
Chilled water piping connected to:
Evaporator
Air handling units
Pumps
Flow switch or flow proving device installed (if
not factory provided)
Strainer installed and cleaned
Condenser and heat recovery condenser (as
applicable) piping connected to:
Condenser
Pumps
Flow switch or flow proving device installed (if
not factory provided)
Cooling tower
Heating loop (as applicable)
Make-up water connected to cooling tower
Water supply connected to filling system
Does unit have freeze inhibitor? If unit has freeze
inhibitor:
Verify type and concentration correct per unit
submittal
Calculate and record freeze point of the
solution:_______________________
Systems filled
Pumps run, air bled from system
Strainer installed in entering water piping
(evaporator and condenser) and cleaned
Relief valve ventilation piping installed (if
applicable)
3. Flow balancing valves installed
Leaving chilled water
Leaving condenser water
Proper porting to measure flow and balance
Optional heat recovery or auxiliary condenser water
(if applicable)
4. Gauges, thermometers, and air vents
Installed on both sides of evaporator
Installed on both sides of condenser and heat
recovery condenser (as applicable)
5. Wiring
Wire size per submittal and NEC 310-16
Full power available
External interlocks (flow switch, pumps auxiliary,
etc.)
Chilled water pump (connected and tested)
Condenser water pump (connected and tested)
Cooling tower fan rotation checked
Heat recovery condenser water pump (as
applicable)
115 Vac power available for service tools as
required

Table of Contents

Other manuals for Trane Optimus RTHD

Related product manuals