ТМ
4.0 TRANSPORTATION, INSTALLATION, COMMISSIONING
4.1 Transportation
Since there’s always water in the vending machine water route, drain the water before the transporta-
tion, long storage or replacing of the hydraulic system individual units. Failure to follow these measures
can lead to vending machine damages! Use an original package for the vending machine transporta-
tion.
Always drain water before the vending machine transportation or storage at ambient
airtemperaturebelow1°С!Failuretofollowthisrequirementcanleadtovendingma-
chine breakdown!
Flushing the vending machine’s water tract
Stop the water supply to the vending machine. Use the suitable container for draining water. To drain
water do the following:
1. Cool down the boiler. For the purpose enter the service menu (menu technician) and select setting
[Functional Tests]. Then press the touch button [Cool Boiler]. Start the cooling process by press-
ingtheOKbutton.Afteryoustarttheprocessthemachinewillpumpsufcientamountofwater
through the boiler to cool it down to 45 degrees. This process can be executed for machines with
external water supply as well as for machines with internal water cans.
2. After the boiler has been cooled the machine’s display shows the OK sign, after which you
should-disconnect the machine from water supply or you should remove the water supply pipes
fromthecans/bottles.Itisalsonecessarytoushwaterfromthepipe,whichsupplieswaterfrom
externalwatersupplyvalveorautonomouswatersupplypump,totheoatchamber.Forthepur-
poseremovethepipefromthevalveorpumpanddirectittotheushbucket.Makesurethatall
the water from the pipe is discharged.
3. Aftercooling,ushtheboiler.Forthepurposeentertheservicemenu(menutechnician)andselect
setting [Functional Tests]. Then press the touch button [Empty Boiler].starttheushingprocess
bypressingtheOKbutton.Themachinewillstartpumpingoutwaterfromtheoatchamberand
the rest of the water tract, which supplies water to the boiler.
4. When the given process will be completed, you will see the OK sign on the touch screen. This is
when you should turn the machine OFF.
5. Place a container under the boiler and remove the pipe from the bottom of the boiler by loosening
thexatorscrew.ThenturnthemachineONandwaituntilallthewaterwouldbeushedfromthe
boiler (until the water stops dripping).
6. Turn OFF the vending machine.
7. Reconnect the pipe to the boiler with the help of the tightening screw.
NOTE:whenusinginternalwatersupplyfromcans/bottlesitisalsonecessarytoushtheau-
tonomous function pump. For the purpose, following the cooling process and removal of supply
pipefromthepump,itisnecessarytomanuallypulldowntheoatfromtheoatchamberuntilthe
pumpstartsandholdtheoatfor5-10seconds.Afterthisyoumustreinstallthepipe(tothevalve
or the pump).