Vertiv | Liebert PEX+Chilled Water | User Manual 16
Installation
No. Description
1 Pallet Screw M8X70
Figure 2-6 Pallet Screws Fixing Position
2.1.3. Inspection
Check that the fittings are complete and the components are intact against the packing list. If any part is missing
or damage, please report immediately to the local oices of the carrier and Vertiv.
2.2. Installation Preparation (Site Preparation)
Liebert® PEX+ series is streamlined for maintaining a favorable environment for equipment rooms, computer
rooms, and similar ecosystems. Strict adherence to the installation procedures is mandatory to ensure that the air
conditioner is installed properly.
2.2.1. Equipment Room Requirements
Before installation, the equipment room must be prepared to ensure a smooth operating flow and to achieve
the expected results. The equipment room must meet the standards, to get proper ventilation and heating.
The design specifications for the air conditioners must be ideal and should match the energy-eicient design
standards.
Following are the requirements to maintain a favorable room environment prior to the installation.