Operation
Towing the machine
BA RC50_RC70 en 00
113
3.27.01 Preparing the machine for towing
Move the drive lever to position P.
a
Parking brake is active.
a
The drive is not active.
Shut down the diesel engine if it is still operational.
Use parking chocks to secure the machine against rolling away.
Replace any damaged pipes or hoses which are leaking oil before
towing (to protect the environment).
Attach towing tools to the machine's lashing points [1] and the towing
vehicle.
Alternatively, attach lifting tackle for hoisting the machine to the
machine's lifting lugs [2] and the crane vehicle.
Towing
Depressurise the hydraulic system and release the spring-operated
brake (only trained specialist personnel).
Alternatively, release the parking brake: Move the drive lever to
neutral position 0.
Remove the chocks.
Tow the machine.
3.27.02 After towing/before repair
Shutting down the machine safely at the location it has been
towed to
Prevent the machine from rolling away with suitable protective
measures (e.g. chocks).
Reapply the parking brakes and re-establish the frictional connection
of the hydrostatic travel drive (only trained specialist personnel).
Apply the parking brake: Drive lever in position P.
Remove the towing tools/lifting tackle.
a
Machine safely shut down.
a
The prerequisites for repair are fulfilled.