EasyManua.ls Logo

Wacker Neuson RC50 - Page 57

Wacker Neuson RC50
222 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation
Loading and transporting
BA RC50_RC70 en 00
57
Drive the roller slowly and carefully from the loading area.
For crane loading, always attach appropriate sling equipment at the
lifting lugs provided for them. The crane vehicle must be positioned
on flat ground providing the bearing capacity required while observing
all relevant safety regulations. In addition, take suitable precautions
to block access to the lifting area in order to prevent any person from
moving or staying within the danger zone. The crane's load table
must correspond to the machine to be lifted. No crane loading must
be performed unless all these items have been complied with.

Table of Contents

Related product manuals