Section Type of inspection Requirements Inspection
by
Type of inspection Inspection
interval
1E ectiveness of technical
ventilation check
E ectiveness of technical
ventilation check
TP/CP
ME
Measurements of air ow speed /
air quantities
Check the di erential pressure
indicator.
continuously
2 Interlock between technical
ventilation and high-voltage,
compressed air and coating product
supply
The technical ventilation should
be interlocked so that the powder
feed and high-voltage cannot be
switched on while the technical
ventilation is not working
e ectively.
CP
FI
Test whether the system is safely
stopped and the product supply,
supply air, and high-voltage
are switched o when the
ventilation is shut down.
annually
3 Parts carrying high-voltage outside
the spray area
Parts carrying high-voltage outside
the spray area must be routed such
that discharges which put people at
risk do not occur.
CP
FI
Inspect and test
(e.g., by measurement) whether
all parts carrying high-voltage
do not result in discharge which
puts people at risk.
weekly
Legend:
MA = Manufacturer
EM = Employer
SP = Skilled person
FSE = Fire safety engineer
ELC = Electrician
TP = Trained person
FI = Function inspection
ME = Measurement
SI = Standard inspection
VI = Visual inspection
CI = Continuous inspection
TI = Technical inspection