32
PEA-C4XL-S
OPERATING MANUAL
VERSION 03/2014 ORDER NUMBER DOC2345334
Procedure:
1. Switch on the high-voltage generation and the powder feed.
Note:
To minimize the wear on the wearing parts, the total feed air and dosing air should be
under 5 Nm³/h!
The atomizing air should be adjusted for the:
fan spray nozzle to 0.1 Nm³/h,
round spray nozzle with de ector cone to 0.2 Nm³/h.
2. Adjust the powder quantity and the powder speed on a test piece.
7.6 OPTIMIZING THE POWDER CLOUD FOR YOUR COATING