50
PEM-X1
OPERATING MANUAL
VERSION 09/2012 ORDER NUMBER DOC 2326020
Section Type of inspection Requirements Inspection
by
Type of inspection Inspection
interval
4 Measures to take if conductive
components are insu ciently
grounded
If su cient grounding of conductive
parts cannot be ensured, their
discharge energy must not exceed
the permissible value.
BP ME/SÜ
Measurement of discharge energy.
Weekly
5 Resistance to ground of work
piece's locating point
The resistance to ground of every
work piece's locating point must not
exceed 1 megaohm (measurement
voltage must be 1000 V). The design
of the work piece receiver must
ensure that the adapters remain
grounded during coating.
BP ME/SÜ
Measure resistance to ground
(work piece receiver - ground
potential) max. 1 MOhm @ 1000 V.
Weekly
Key:
HE = Manufacturer
AG = Employer
BP = Capable person
BSB = Fire safety engineer
EFK = Electrician
UP = Trained person
FU = Function inspection
ME = Measurement
OP = Standard inspection
SI = Visual inspection
SÜ = Continuous inspection
TP = Technical inspection