51
PEM-X1
OPERATING MANUAL
VERSION 09/2012 ORDER NUMBER DOC 2326020
Section Type of inspection Requirements Inspection
by
Type of inspection Inspection
interval
6 Measures to take if the work pieces
are insu ciently grounded
If su cient work piece grounding
in accordance with section 6
cannot be ensured, appropriate
equipment, e.g. ionizers, may be
used to discharge electric charges
on the work piece. Such equipment
must not exceed the permitted
discharge energy of the spray
systems with which it is used. In
terms of permitted discharge
energy, this equipment must be
put through the same inspections
as the powder spray systems used
with it. The discharge equipment
must be interlocked with the spray
system such that the high-voltage
is switched o and that coating
cannot take place if the discharge
equipment malfunctions.
BP ME/FU/SÜ
Measurement of discharge
energy, check the monitoring
equipment's test function by
triggering it.
Weekly
7E ectiveness of the manually
or automatically actuated re
extinguishing systems (room
protection system)
E ectiveness of the manually
or automatically actuated re
extinguishing systems (room
protection system).
HE/BSB FU
Trigger re extinguishing
system, observe manufacturer's
requirements
6 months
Key:
HE = Manufacturer
AG = Employer
BP = Capable person
BSB = Fire safety engineer
EFK = Electrician
UP = Trained person
FU = Function inspection
ME = Measurement
OP = Standard inspection
SI = Visual inspection
SÜ = Continuous inspection
TP = Technical inspection