Maintenance
5612−1/A1
RT-flex58T-D
Winterthur Gas & Diesel Ltd.
3/ 3
5. Assembling of exhaust valve control unit
⇒ All O-rings must be replaced by new ones.
⇒ The threads of all screws, piston 11 and slide rod 15 (Fig. ’C’) must be oiled
prior to their fitting.
⇒ Equally tighten screws 9 with a torque of 170 Nm and screws 12 of 70 Nm.
⇒ Fit rail valve 3 with screws 5 and tighten them with a torque of 2.5 Nm.
II
II
III
II-II
III-III
3
19
18
2221
20
17
8
27
12
9
D
3
28
III
015.978/07
5
2013
Exhaust Valve Control Unit: Removal, Fitting, Dismantling and Assembling