EasyManua.ls Logo

Yamaha BR250F - Engine Installation

Yamaha BR250F
191 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2-4. ENGINE
INSTALLATION
1.
Place
the engine in the
chassis.
Torque
the three engine mounts
to
specification.
Tightening torque:
Bolt: 3.0 m-kg (22 tt-lb)
Nut:
1.4 rn-kq (10
ft-lb]
2. Install or connect the following compo-
nents in the order given below.
Primary
Sheave,
V-belt. and drive
guard (Refer
to
4-4, D "Assembly")
Carburetor (Refer
to
3-1, A III nstal-
lation")
PulsePipe
Oil line
that
feeds the oil pump
Four magneto leads
D-handle
to
the starter rope
Spark plug and spark plug wire
Spark Plug Tightening Torque:
2.5'"
3.0 m-kg
(18'"
22 ft-lb)
Muffler
and hood
limiter
bracket.
2-19

Table of Contents

Related product manuals