EasyManua.ls Logo

ZCS AZZURRO HYD6000 - Assembly Instructions

Default Icon
94 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
User’s Manual 1PH HYD3000-HYD6000-ZSS
Rev. 1.1 16/03/2021
Identification: MD-AL-GI-00
Rev. 1.1 of 16/03/2021 - Application: GID
15/94
3.6. Assembly instructions
Step 1: Position the mounting bracket on the wall, mark the 8 fixing points using the marker. Drill 8 holes (6 mm
drill bit) in the wall.
Step 2: Insert the expansion screws vertically into the hole, make sure that the insertion depth is neither too
shallow nor too deep.
Step 3: Fix the mounting bracket to the wall using dowels and flat washers.
Step 4: Place the 1PH HYD3000-HYD6000-ZSS inverter on the mounting bracket.
Step 5: Use the grounding hole of the heatsink to ground the 1PH HYD3000-HYD6000-ZSS inverter.
Step 6: OPTIONAL: the 1PH HYD3000-HYD6000-ZSS inverter can be fixed to the mounting bracket.
Note: For safety reasons, ZCS Spa and/or its partners may not carry out any technical repairs or maintenance
work, or move the inverter or battery packs from and to the ground if they are installed at a height of more than
180 cm from the ground.

Related product manuals