User’s Manual 1PH HYD3000-HYD6000-ZSS
Rev. 1.1 16/03/2021
Identification: MD-AL-GI-00
Rev. 1.1 of 16/03/2021 - Application: GID
7. Verification of proper functioning
To check the proper functioning of the inverter, follow these steps:
1. Switch off any source of photovoltaic generation by turning the circuit breaker to the OFF position.
2. Lower the protection switch of the 1PH HYD3000-HYD6000-ZSS inverter. The inverter will remain
switched on but will go into error due to a lack of AC power (if the EPS function is enabled, it will
feed the priority loads).
3. Power up the inverter by pulling up the AC switch.