EasyManua.ls Logo

2gig Technologies EDGE - Network and Firmware Update Tests

2gig Technologies EDGE
60 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
58
2GIG EDGE User Guide
Network Tests
Tap START to run a test on network connections: LAN,
Internet and Backend.
When tests are successful, a GREEN check mark
appears to the left of the test name. This indicates the
network is operating and the signal strength was good.
WARNING!! If a RED appears, it indicates the
test failed. If the network continues to fail, contact
your dealer for technical assistance.
Network Test
Firmware Update
This option is only available if a USB update is available,
and the update was not initiated from the "pop-up".
1. At the System Settings screen, tap the
Firmware Update (
) icon.
2. A test will be performed to determine if the panel
is ready to be updated. If all requirements are not
met, a list will be displayed with red icons next
to any aspect of the test that did not meet the
requirement for a panel update.
3. Tap UPDATE to begin the USB update process.
NOTE: Red icons next to a specic requirement
indicates that the test failed. Remedy the error,
then repeat steps 1 through 3.
Firmware Update

Table of Contents

Other manuals for 2gig Technologies EDGE

Related product manuals