94 ZX2 GAS-INSULATED MEDIUM VOLTAGE SWITCHGEAR
Test sequence
Connect the test transformer to the test plug or
test cable and ground the other two phases of
the main circuit.
Connect the second terminal of the test
transformer to system ground.
Connect other sections of the switchgear to be
tested by operating the relevant disconnects
and circuit-breakers.
Cancel the grounding of the system section to
be tested before applying the test voltage.
Perform the high voltage test.
Ground the system section on completion of
individual tests and on conclusion of testing.
Dismantle the test cables or test plugs.
Fit any surge arresters and voltage
transformers required.
Close off any free test sockets and cable
sockets with blanking plugs.
Close off free outer cones with insulating
blanking plugs in accordance with the
manufacturer’s instructions.
Cancel any isolation of voltage transformers in
metering panels.
Remove the short-circuiting plugs from the
capacitive indicator.
Refit the cover on the cable termination
compartment.

Table of Contents