EasyManua.ls Logo

Acer Aspire Z1100 - Mainboard Installation

Acer Aspire Z1100
174 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3-46 Machine Maintenance Procedures
Mainboard Installation 0
NOTE:
NOTE:
Make sure all cables are clear when installing mainboard.
1. Align and install mainboard to guidepins (Q) on middle frame. (Figure 3-41)
2. Install and secure screws (P) to middle frame.
3. Connect the following cables: (Figure 3-42)
Button board cable (H) to mainboard connector (h)
Fan cable (J) to mainboard connector (j)
ODD cable (K) to mainboard connector (k)
LVDS cable (M) to mainboard connector (m)
Camera cable (N) to mainboard connector (n)
Function board cable (G) to mainboard connector (g)
4. Connect the following cables: (Figure 3-41)
Right light bar cable (C) to mainboard connector (c)
Speaker cable (B) to mainboard connector (b)
Infrared board cable (A) to mainboard connector (a)
Left light bar cable (D) to mainboard connector (d)
Power board cable (E) to mainboard connector (e)
Converter board cable (F) to mainboard connector (f)
5. Install CPU, Thermal Module, RTC Battery, WLAN Module, DIMM Modules and TV Tuner
Module.
ID Size Quantity Screw Type
P M3.0x5.0 2

Table of Contents

Related product manuals