EasyManua.ls Logo

AD Systems SP 10 - SETUP

AD Systems SP 10
47 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 10
Doc : AM220-001E Release: 1.5 updated : October 2014
SETUP
Install the SP 10 in an air draft free place on a horizontal flat workbench not subject to vibrations. Provide
enough space so that the analyzer can be operated conveniently. Make sure that the cooling fan on rear
panel is not obstructed and keep enough space for access to rear connectors.
Remove the touch screen protection film
Important Notices:
Install the SP 10 on a horizontal flat workbench.
o Horizontal is important! Flame goes strictly vertical at any position of the
instrument. If the SP10 unit is inclined, flame height measurement can be
erroneous.
Do not install the SP 10 under direct sunlight or under light sources
o Light beams or reflections can disturb proper operation of the flame image
detection
Protect the analyzer from air draft
o The instrument is typically installed in a ventilated fume hood to evacuate smoke
and combustion gases. It is normal installation. But don’t close the fume hood door
that could create strong air flow. This could affect the measurement.
Make sure that the space around the motorized candle conveyor is free
o Put away any objects that could affect free movement
o When the conveyor goes down after the test, make sure that there is no any
objects under the conveyor.
Avoid any vibration of the instrument during the measurement.
Prevent the instrument from power supply spikes or sudden power failures.
Make sure that the cooling fan on rear panel is not obstructed and keep enough space for
access to rear connectors