5-66 ADS TRITON+ Manual
Passing un-tethered end through large loop
Cinching the tether to the top rung
4. Position the bar in the manhole frame so the sensor has a clear
view of the manhole invert.
Perform the following adjustments to ensure proper sensor
positioning:
Ensure the point of measurement is properly positioned
over the invert and flow.
Point of Measurement