Checklist for the floor mounted column and tube head unit
The user shall perform these checks before using the floor mounted column
and tube head unit.
Table 6: Checklist
Check Mitigation
Before using the system
Do the rails show folding or dam-
age?
Contact the manufacturer if a problem
is detected.
Has dust collected on the rails?
Does the movement in any direc-
tion produce abnormal noises?
Do any of the brakes that stop
movement behave incorrectly?
Does the device behave abnormal-
ly in any way?
Is there any malfunction on the
control buttons?
Valory (system with floor mounted column) | Introduction | 69
0426A EN 20220804 1858