x530L Series Installation Guide for Virtual Chassis Stacking
201
Verifying the Stack
To verify the stack, perform the following procedure:
1. Start a local management session on any switch in the stack. Refer to
“Starting a Local Management Session” on page 150.
2. From the User Exec mode, type the SHOW STACK command:
The following example is from a stack of three switches:
Review the following items:
The command should list all the switches. If the list is incomplete,
refer to Chapter 10, “Troubleshooting” on page 211.
The Operational Status field should be “Normal operations” to
indicate that all the stacking ports are operating normally.
If the Operational Status field is displaying “Not all stack ports are
up,” one or more stacking ports are not being used or cannot
establish links with their counterparts. For more information, refer
to Chapter 10, “Troubleshooting” on page 211.
3. Go to Chapter 9, “Cabling the Networking Ports” on page 203, to
complete the installation.
awplus> show stack
awplus> show stack
Virtual Chassis Stacking summary information
ID Pending ID MAC address Priority Status Role
1 - e01a:ea20:8011 1 Ready Active Master
2 - e01a:ea20:8012 2 Ready Member
3 - e01a:ea20:8902 3 Ready Member
Operational Status Normal operations

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Allied Telesis x530L Series and is the answer not in the manual?

Allied Telesis x530L Series Specifications

General IconGeneral
BrandAllied Telesis
Modelx530L Series
CategorySwitch
LanguageEnglish

Related product manuals