Verifying the
Master x530L-
18GHXm Switch
Perform the steps in Table 24 to confirm the configuration of the master
switch.
10 Restart the switch with the REBOOT command.
awplus# reboot
reboot system? (y/n):
awplus#
11 Type “Y” for yes.
12 Wait two minutes for the switch to initialize the management software.
13 Go to “Verifying the Master x530L-18GHXm Switch” on page 181.
Table 26. Configuring the Master x530L-18GHXm Switch for 5Gbps Stacking Ports – Part II
Step Description and Command
Table 27. Verifying the Master x530L-18GHXm Switch
Step Description and Command
1 Start a new local management session on the master switch.
2 Move to the Privileged Exec mode with the ENABLE command.
awplus> enable

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Allied Telesis x530L Series and is the answer not in the manual?

Allied Telesis x530L Series Specifications

General IconGeneral
BrandAllied Telesis
Modelx530L Series
CategorySwitch
LanguageEnglish

Related product manuals