EasyManuals Logo

Allied Telesis x530L Series User Manual

Allied Telesis x530L Series
228 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #184 background imageLoading...
Page #184 background image
Chapter 8: Building the Stack Trunk with 5Gbps Multi-Speed Ports
184
What to Do Next
After configuring the master switch, do the following:
1. Power off the switch by disconnecting its AC power cords from the AC
power sources. Refer to Figure 91.
Figure 91. Powering Off the Switch
2. Configure the member switches. Refer to “Configuring the x530L-
10GHXm Member Switches” on page 185 or “Configuring the x530L-
18GHXm Member Switches” on page 192.
3. After configuring the master and member switches, cable the ports of
the stack trunk on all the switches. Refer to “Cabling Twisted Pair
Ports” on page 204.
4. Power on the master and member switches of the stack. Refer to
“Powering on the Stack” on page 200.
5. Verify that the switches formed the stack by referring to “Verifying the
Stack” on page 201.
6. Cable the networking ports. Refer to Chapter 9, “Cabling the
Networking Ports” on page 203.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Allied Telesis x530L Series and is the answer not in the manual?

Allied Telesis x530L Series Specifications

General IconGeneral
BrandAllied Telesis
Modelx530L Series
CategorySwitch
LanguageEnglish

Related product manuals