Cayros BAG0172.7
10.3 Maintenance schedule – overview
• Execute maintenance tasks after the first scheduled
maintenance period has been reached.
The times, running hours or maintenance intervals of any
third party documentation shall have priority.
Before each start-up
1. Check the hoses/tubes and connecting pieces for visible
defects/leaky connections.
2. Repair any areas of chafing on hoses and tubes.
3. Replace any worn or damaged hose and tubes immediately.
4. Fix leaky connections immediately.
After the first working run
Component
Workshop work
Hydraulic system
• Check for leaks
• Check for defects on the hose
lines
61
Daily
page
• Check for visible defects
• Clean after operation, and
protect uncoated surfaces
against corrosion
Shares / other wear parts
• Condition check, replace if
necessary
59
Shear bolts
• Check all bolts for tightness,
replace if necessary
59
Weekly / 50 operating hours
Hydraulic system
• Check for leaks
• Check for defects on the hose
lines
61
Support wheel
• Check inflation pressure, correct
if necessary
60
• Check the bearing clearance on
the wheel hubs
60