EasyManua.ls Logo

Amazone Cayros Series - Maintenance Schedule - Overview

Amazone Cayros Series
68 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Table of Contents
Cayros BAG0172.7
02.20
10.3 Maintenance schedule overview
Execute maintenance tasks after the first scheduled
maintenance period has been reached.
The times, running hours or maintenance intervals of any
third party documentation shall have priority.
Before each start-up
1. Check the hoses/tubes and connecting pieces for visible
defects/leaky connections.
2. Repair any areas of chafing on hoses and tubes.
3. Replace any worn or damaged hose and tubes immediately.
4. Fix leaky connections immediately.
After the first working run
Component
Servicing work
see
page
Workshop work
Hydraulic system
Check for leaks
Check for defects on the hose
lines
61
Daily
Component
Servicing work
see
page
Workshop work
Whole implement
Check for visible defects
Clean after operation, and
protect uncoated surfaces
against corrosion
Shares / other wear parts
Condition check, replace if
necessary
59
Shear bolts
Check all bolts for tightness,
replace if necessary
59
Weekly / 50 operating hours
Hydraulic system
Check for leaks
Check for defects on the hose
lines
61
Support wheel
Check inflation pressure, correct
if necessary
60
Check the bearing clearance on
the wheel hubs
60

Table of Contents

Related product manuals