Chapter 4 – Functions of the instrument
UM-18400E-U ATEQ F580 User manual Page 107/168
p) « Double RESET + dump » cycle end (automatic dump)
If the part is OK, the part PASS relay is activated as soon as the test time is finished,
and remains so until the next cycle is launched. At the end of the dump time, the end of
cycle relay is activated (or after coupling time B if a value has been set for it).
If the part is Bad, as soon as the test time is over, the dump phase is carried out and the
FAIL part relay is activated
A first press on the
RESET key or activation of the RESET input cancels the
result relay. The End of Cycle is obtained by pressing a second time on the
RESET
key or by activating the RESET input again.
PRESSURE
START
RESET
A P-F P-D F S T D
t
t
t
t
t
t
t
Program
Auto
connector A
t
FAIL part
Time B
Time B
Auto
connector B
End of Cycle
Test cycle
Control actions
t mini
t mini
t mini
Active
Inactive
Active
Inactive
The active program is the one selected before starting up. It remains active even if the
program inputs on the connector are no longer activated. This selection can only be
modified during the inter cycle period.
To return to program 1, when a cycle is not in progress, press any of the program
selection inputs.