ATEQ F580 - Start-Up and Settings; 1. Powering-Up the Instrument

ATEQ F580
180 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 3 – Start-up and settings
UM-18400E-U ATEQ F580 User manual Page 35/168
Chapter 3
START-UP AND SETTINGS
1. POWERING-UP THE INSTRUMENT
Connect the network power supply.
When it is powered, the instrument
initiates.
The movement of the bar graph
indicates the level of completion of
the start-up.
C 540 VX.XXi
STARTUP
Then displays the main menu, the
instrument is ready.
MAIN MENU
RUN CONFIG
PARAMETERS SERVICE
DISPLAY RESULTS
10:57:22 18/06/2002