Chapter 1 – Installation of the instrument
UM-18400E-U ATEQ F580 User manual Page 13/168
3. INSTALLATION AND CABLING
Control unit electric supply: 90 to 260 V AC / 50W.
Measurement heads electric supply: 24 V DC (23.5 to 28 V) / 2 A by head.
The heads electric supply can be done by three means:
¾ By the 24 V DC jack connector,
¾ By the J3 connector (Inputs/Outputs All or nothing) by the 2 or 4 pins (+24V)
and the 16 pin (0 V).
¾ On the Lumberg M12 type connector reserved to the remote control on the 2
(+24V) and 4 (0 V) pins.
The network end
caps must be
placed on the “free”
RS 485 connectors,
on the control unit
and on the last
heads.
CENTRAL
MEASUR
UNIT
N° 4
MEASUR
UNIT
N° 1
MEASUR
UNIT
N° 2
Female
network cap
Male
network cap
MEASUR
UNIT
N° 3
24 V DC
24 V DC
24 V DC
24 V DC
The control unit and the I/O module can be located at any place in the network.
3.1. CONTROL UNIT PHYSICALLY POSITIONNED BETWEEN THE HEADS
CENTRAL
HEAD
N° 4
HEAD
N° 1
HEAD
N° 2
Female
network cap
Male network
cap
24 V DC
24 V DC
24 V DC
I/O
MODULE
HEAD
N° 3
24 V DC
CENTRAL
HEAD
N° 4
HEAD
N° 1
HEAD
N° 2
Female
network cap
Male network
cap
24 V DC
24 V DC
24 V DC
I/O
MODULE
HEAD
N° 3
24 V DC