EasyManua.ls Logo

ATEQ F580 - 3. Installation and Cabling

ATEQ F580
180 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 1 – Installation of the instrument
UM-18400E-U ATEQ F580 User manual Page 13/168
3. INSTALLATION AND CABLING
Control unit electric supply: 90 to 260 V AC / 50W.
Measurement heads electric supply: 24 V DC (23.5 to 28 V) / 2 A by head.
The heads electric supply can be done by three means:
¾ By the 24 V DC jack connector,
¾ By the J3 connector (Inputs/Outputs All or nothing) by the 2 or 4 pins (+24V)
and the 16 pin (0 V).
¾ On the Lumberg M12 type connector reserved to the remote control on the 2
(+24V) and 4 (0 V) pins.
The network end
caps must be
placed on the “free”
RS 485 connectors,
on the control unit
and on the last
heads.
CENTRAL
MEASUR
UNIT
N° 4
MEASUR
UNIT
N° 1
MEASUR
UNIT
N° 2
Female
network cap
Male
network cap
MEASUR
UNIT
N° 3
24 V DC
24 V DC
24 V DC
24 V DC
The control unit and the I/O module can be located at any place in the network.
3.1. CONTROL UNIT PHYSICALLY POSITIONNED BETWEEN THE HEADS
CENTRAL
HEAD
N° 4
HEAD
N° 1
HEAD
N° 2
Female
network cap
Male network
cap
24 V DC
24 V DC
24 V DC
I/O
MODULE
HEAD
N° 3
24 V DC
CENTRAL
HEAD
N° 4
HEAD
N° 1
HEAD
N° 2
Female
network cap
Male network
cap
24 V DC
24 V DC
24 V DC
I/O
MODULE
HEAD
N° 3
24 V DC

Table of Contents

Related product manuals