FlexiROC T35 R/T40 R 4 Daily checks
23 No: 3171473547.1 en
4 Daily checks
4.1 Foreword
This chapter provides instructions for daily inspection and maintenance to be carried out by
the operator before each shift.
Regarding weekly inspections ad other maintenance tasks, see separate instructions
"Maintenance schedules".
4.2 Extra safety check
4.2.1 Safety
DANGER
Serious injury or death
Danger of moving parts
u Risk of serious personal injury
u Set all levers and switches in neutral position before preparing start-up
u Perform the extra safety check without the engine running
DANGER
Serious injury or death
The side hatches on the drill rig are not dimensioned for extra weight
u Risk of serious personal injury
u Standing, sitting or leaning on the side hatches can result in serious injury
u The side hatches must be closed when work is carried out on top of the rig
Before each shift starts an extra and thorough visual safety check should be carried out in
order to detect:
n Damage that could give rise to structural weakness or cracks.
n Wear that could have the same consequences.
n Cracks or fractures in materials or welded joints.
If the drill rig has been subjected to abnormally high stresses, vital load-bearing compon-
ents may have been damaged. From a safety viewpoint, it is therefore especially important
to check the following points (see illustration: Check points).