EasyManua.ls Logo

Bauer Compact-Line JUNIOR II-B - 6 Installation; Preparing the Installation Site

Bauer Compact-Line JUNIOR II-B
106 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6 Installation
6.1 Preparing the installation site
1.
Ensure necessary environmental conditions, see Technical data.
2.
Make sure that the surface is even and clean.
3.
Ensure that the machine’s own weight and all operating forces can be accep-
ted and that the stability of the machine is guaranteed.
4.
Ensure that the undergrund is suitable for the fixation of the machine accord-
ing to the fundation plan.
5.
Ensure that there is enough space around the machine. Observe the minimum
required distances and the pivot range of the doors.
6.
Ensure that the cooling air openings leave free.
OPERATING MANUAL
Installation | 6
10-10-2016
A_Compact-Line_002_en
55/106

Table of Contents