7 Commissioning and operation
7.1 Starting up the unit
7.1.1 Checks before each commissioning
The unit is correctly installed and connected.
All the safety equipment is installed and tested for proper function.
1.
Ensure that only trained, instructed or competent personnel operate the ma-
chine, see Chapter 2.6.2 Personnel selection and qualification, Page 25.
2.
Determine whether maintenance work needs to be performed, see Chap-
ter 9.2 Maintenance table, Page 77.
3.
Perform oil level check and if needed, refill oil, see Chapter 9.5 Maintenance
activities - Lubricating oil system, Page 82.
4.
Perform a visual inspection of all components. If there are any irregularities,
switch off the unit immediately and locate and rectify any errors or get in
touch with the BAUER customer service department, see Chapter 1.2.7 Con-
tact data BAUER KOMPRESSOREN, Page 13.
5.
For first commissioning, observe Chapter 7.1.2 Starting up the unit for the
first time, Page 60 in addition.
6.
When commissioning after a long standstill, observe Chapter 7.1.3 Starting up
the unit after longer downtimes, Page 61 in addition.
Ä
The unit is ready for operation.