EasyManua.ls Logo

baxter Flo-Gard 6201 - Charging the Batteries

baxter Flo-Gard 6201
224 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3 Charging the Batteries
3-2 FLO-GARD 6201 VOLUMETRIC INFUSION PUMP SERVICE MANUAL 07-19-B1-688
Q Functional Test 1
Keypad test and Panel Lock switch test
Nurse call test
DC voltage measurement test
Main speaker test
Back-up beeper test
Calibration constants checked
Q Final Accuracy Test
Pump was tested at 125 mL/hr and 10 mL/hr
KVO test
Q Upstream/Downstream Pressure and Air in Line Test
Downstream occlusion
Upstream occlusion
Air alarm inspection
AIL sensor value with empty tube
AIL sensor value with primed tube
AIL with back pressure service code check
Air alarm test
Q Functional Test 2
Free flow prevention
Door open/closed inspection
FSR and air sensor inspection
Drive defect inspection
Electrical safety tests
Factory setting verification
Q Final Run-In Test
Pump runs at 500 mL/hr for 6 hours and 999 mL/hr for 6 hours
Charging the Batteries
To charge the batteries, plug the pump into a hospital-grade AC outlet. Verify
that the Plug icon lights.
If the charging state of the batteries is unknown or the pump has not been
plugged in to AC power for at least 16 uninterrupted hours then the pump must
be charged for at least 16 uninterrupted hours of charging prior to releasing it
for use.

Table of Contents

Other manuals for baxter Flo-Gard 6201

Related product manuals