EasyManua.ls Logo

baxter Flo-Gard 6201 - Testing New and Recently Serviced Pumps

baxter Flo-Gard 6201
224 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
07-19-B1-688 FLO-GARD 6201 VOLUMETRIC INFUSION PUMP SERVICE MANUAL 3-3
Preparation for Use Testing New and Recently Serviced Pumps
Testing New and Recently Serviced Pumps
Before placing new and recently serviced pumps into service at your facility,
perform the following tests:
Note: Allow the pump to stabilize at operating temperature (15° – 38° C
(59° – 100° F)), and perform the initial battery charge before performing the
self-test.
Note: Adjust the volume control (located on the rear of the pump) to its highest
setting.
1. “Self Test” on page 10-3
2. “Free Flow Prevention Test” on page 10-11
3. “Electrical Safety Tests” on page 10-11
4. Perform one of the following tests, at your discretion:
Q “Measurement by volume per time” on page 10-12
Q “Measurement incorporating VTBI option” on page 10-12
If the pump fails to pass any of the tests, contact your Baxter customer
representative.
If you want to perform additional testing before placing pumps into service,
refer to the complete Operational Checkout provided in Chapter 10,
“Operational Checkout”.

Table of Contents

Other manuals for baxter Flo-Gard 6201

Related product manuals