BDCOM S6508 Switch Hardware Installation Guide
3.2 Site for installing
Planning a proper location for the switch and layout of your equipment rack or wiring
closet is essential for successful system operation.
Please confirm that the following requirements are reached:
The Site have enough air flowing in the switch.
The Site have enough Power for switch.
The site have enough space to maintain.
3.3 Installing Rack
3.3.1 Notice proceeding
Read the following notes before installing the Rack.
The expand bolt connecting the Rack base and the ground must be installed
complete, the order from up to down must be the nut, the stretch gasket and the
big flat gasket, and the joint between the hole in the chassis base and the
expand bolt.
The Rack must be stably after installing.
The Rack must be apeak after installing.
The Rack must be a beeline with other Rack in the room, the error must be less
than five millimeter.
The front door and the back door must be installed, and be all right when open
and close, the lock is OK, and the key is all ready.
There is no spilth and uncorrective label in the Rack or on the board of the
Rack.
The handle must be installed completely .
The equipment in the chassis must be fixup by bolt, and the bolt must be same.
The singal board of the equipment must be installed fastness, the bolt in the
faceplate must be compactness.
The cable thoughout hole in the Rack top or bottom must install defending
-
mouse
-
net, the gap must less than 1.5cm, it can prevent mouse and other little
animal into the Rack.
ESD wrist strap must be equipped in the Rack.
- 33 -