EasyManua.ls Logo

Bioquell QUBE - Page 36

Bioquell QUBE
80 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
USER MANUAL
TD069-O&M-001
REVISION 6
Page 36 of 80
The Operator must be LOGGED ON to run a gassing cycle. Refer to section 5.4.3
for information on managing users of the system.
Home Page
This page depicts the system
configuration.
Select the cycle button, on
the navigation bar.
The Cycle Start Page is displayed.
Cycle Start Page
Supervisor or above access level
is required to change the type of
cycle, i.e. complete system or
HPV only cycle, after which an
Operator can choose and run a
cycle. After a complete system
cycle it automatically reverts
back to a HPV only cycle.
Select cycle recipe from the list
shown.
Press “Load”.
Cycle type
selection
The cycle name of the currently loaded
cycle is displayed here. Press to view/
select from the list of cycles.
Cycle recipes (refer to
Section 4.4 )

Table of Contents